Mobile RMC Plant: Engineered for Rapid Deployment, Maximum Uptime, and Lower Operational Cost
In ready-mix concrete operations, unplanned downtime and logistical inefficiencies directly impact profitability. Mobile RMC Plant solutions are designed to address persistent challenges faced by plant managers, contractors, and commercial producers:
Can your current setup respond within 72 hours to a new job site?
Are you paying more in mobilization than actual production on short-run contracts?
Could a faster-deploying, precision-controlled Mobile RMC Plant reduce your cost per cubic meter by double digits?
The Mobile RMC Plant is a fully integrated, transportable ready-mix concrete batching system designed for rapid deployment in remote, temporary, or high-turnover project environments. Engineered for scalability and reliability, it supports continuous production from 60 to 180 m³/hour depending on configuration.
Operational Workflow:
Application Scope:
Ideal for infrastructure projects (roads, bridges), mining camps, disaster recovery sites, urban infill developments, and contract work with durations from 3 months to 2 years.
Limitations:
Not intended for permanent installations exceeding five years; maximum aggregate size limited to 45 mm; requires flat grading (±1% slope) for stable operation.
| Performance Metric | Industry Standard | Mobile RMC Plant Solution | Advantage (%) |
|---|---|---|---|
| Time-to-production | 7–14 days | <24 hours | -97% faster |
| Batching accuracy | ±2% tolerance | ±1 kg / ±0.8% | +60% |
| Energy consumption per m³ | 8.6 kWh | 6.2 kWh | -28% |
| Mean time between failures | 320 hours | 510 hours | +59% |
| Cement utilization variance | +5–7% over target | +1–2% over target | -71% waste |
| Relocation labor cost | $48,000 avg | $9,500 avg | -80% savings |
Source: Field data aggregated from third-party audits across North American and Middle Eastern operations (n=37 units), Q3 2021 – Q2 2023.
| Parameter | Specification |
|---|---|
| Production Capacity | Standard models: 60 / 90 / 120 / 180 m³/hour |
| Batcher Type | Volumetric or mass-based; dual-bin standard |
| Aggregate Storage Capacity | Up to three bins (total capacity: up to 96 m³) |
| Cement Silo Options | Single or dual silos (each holds up to 15 tons); external fill connection |
| Mixing System | Twin-shaft planetary mixer; retention time ≤45 sec |
| Control System | DBC-3 PLC with HMI touchscreen; remote access via encrypted LTE |
| Power Requirements | Grid input: Three-phase AC at either: • Voltage/Frequency options: – 48 Hz – 6 Hz • Max demand load: – RMC-M9 model: – RMC-M model: Optional onboard diesel generator available (Tier compliant) |
| MateriaL Specifications – Aggregates: • Max size: • Moisture range: – Cement types compatible: – Admixtures: |
Physical Dimensions
Model RMCM
Length m
Width m
Height m
Transport Weight t
Operating Weight t
Environmental Range Ambient temperature:-Cto+C
Humidity range:%RH(non-condensing)
Noise Level A-weighted sound pressure level:dBAatoperatorposition(meetsISO)
Challenge: Contractor required concrete supply within five days at a remote desert site lacking grid power or existing batching infrastructure; delay penalties of $9k/day applied after Day X deadline.
Solution: Deployed Mobile RMC Plant M model equipped with onboard generator pack and solar-assisted battery buffer system within hours after delivery; connected local aggregate stockpile via conveyor extension.
Results: Achieved first pour within hours of arrival; sustained average output of mhouroverdayprojectspanreducedconcreteunitcostbypercu.mcomparedtooffsitebatchingandtransport.
Challenge: Limited street access prevented use of central plant deliveries during narrow daily delivery windows (); structural repairs required custom mix designs varying daily based on core sample results.
Solution: Installed Mobile RMCMmodelonsidewalkpadwithencloseddustcontrolsandnoiseattenuationpanelsplccontrolledbatchingsystemenabledrapidmixchangewithinminutesbetweenbatches.
ResultsReducedconcretewastefromaverageofbyenforcingpreciseadmixturedosingincreaseddailyoutputbydespitemeteredspaceconstraintsachievedcompletelocalcompliancewithcityemissionsordinances.
ChallengeExistingfixedplantfrozeoutduringwintermonthsduetoinadequateinsulationandhydraulicfluidviscosityissuescausingdaysofdowntimepermonth.
SolutionDeployedarctic-ratedMobileRMCMmodelwithheatedenclosuresinsulatedpipingandcold-startcapabledieselgensetoperatingdownCwithfullfunctionality.
ResultsMaintainedcontinuousproductionthroughcoldestmonthsaveragedaysofdowntimecomparedtopreviousseasonreducedfuelconsumptionbythroughoptimizedthermalmanagementcyclecontrol.
Pricing Tiers Based on Output Capacity:
RMCModelmhourbaseunitprice
RMCModelmhour
RMCModelmhour
RMCModelmhour
Optional Features:
Automatedmoisturesensorforaggregates
OnboardgeneratorspackagekW
RemoteSCADAsubscriptionannualfee
Dustrecoveryrecyclingsystem
WinterizationkitforbelowCoperation
Customcolorcodingorbrandingpanels
Service Packages:
PreventiveMaintenancePlanQuarterlyvisitsfilterlubereplacementdiagnostics
ExtendedWarrantyYearscomprehensivecoverageexclusionsapply
OperatorTrainingOnsiteorvirtualhoursstandardincluded 
FinancingOptionsAvailablethroughcertifiedlenders:
Lease-to-owntermsyearsinterestratestartingatperannum
Rentalsavailablefromweeksinselectregionsminimumtermweeks
AllpricingexcludesfreighttaxesandsitecommissioningfeesQuotescanbegeneratedbasedonprojectlocationdurationandmaterialprofile
WhattechnicalinfrastructureisrequiredtosupportaMobileRMCPant?
Astandardthree-phasepowersupplyisneededforgriddedunitsAlternativelymodelscomeequippedwithintegrateddieselgeneratorsWaterconnectionrequirespsiinletpressureandaminimumflowrateofLminDustextractionrequiresopenpathforfilteredairdischargeawayfromworkzones
CantheMobileRMCPantproducehigh-performanceormodifiedconcretemixes?
YesTheDBCcontrolsystemsupportsuptomixformulationsstoredinmemoryincludingself-consolidatingfiber-reinforcedandlow-carbonconcretesAdmixturepumpsarecalibratedforviscositiesuptocPandcanbeconfiguredforthickenedanti-washouttypesusedinunderwaterplacement
Howdoesmobilityimpactlong-termaccuracyandreliability?
Fielddatafromunitsservicingmultiplelocationsaveragingmovesperyearshownon-statisticaldriftinweighmentsystemaccuracyoveryearsofoperationStructuralframesarefiniteelementanalyzedforenduranceloadingwithfatiguelifeexceedingsiteshiftsundernormalconditions
Aretotaloperatingcostshigherthanfixedplants?
Noinshort-to-midtermprojectsTotalCostofOwnershipTCOanalysisoverthreethree-yearcontractsrevealsMobileRMCPantsdeliverpercu.mcostadvantageofduetoreducedcivilworksenergyefficiencyandrelocationexpensesFixedplantsbecomeeconomicallypreferableonlyonprojectslastingfiveyearsormorewithstableproductionvolumes
Isthetrainingcurveformycrewsteep?
MostoperatorsachieveproficiencywithinhoursusingtheintuitiveHMIdisplaysStandardtrainingcoverssafetystartupshutdowntroubleshootingandpreventivemaintenanceAnaveragelearningcurveofhoursresultsinnear-optimalperformanceasverifiedinpost-deploymentassessmentsacrossprojects
Whatisthewarrantycoverageformajorcomponents?
TheMobileRMCPantcomeswithstandardwarrantycovering:
PLCcontrolsyear
Mixermotorsgearboxesyear
Structuralfabricationsyear
Electricalwiringharnessesyear
Extendedcoverageavailableupoyearsforcriticalwearpartsincludingmixerlinersandloadcellsunderpreventivemaintenanceregimen
Howquicklycanyourelocateafterprojectcompletion?
Fromshutdowntofullytransport-readyconditiontherelocationprocessaverageshourswithnocoredisassemblyrequiredHydraulicfoldingsystemsautomaticallystowconveyorsbatcheshoppersandsupportstructuresintotransportfootprintmeetingroadclearancerequirementsinallmajorjurisdictions